Sub-station

Communication base station outdoor cabinet size and configuration

by:KEBO      2020-04-26
According to the use of functions, communication base station can generally be divided into dynamic integration of outdoor cabinet cabinet ( Used to install the integration of power supply, battery cabinet) , equipment cabinets, Equipment room, power supply and the battery outside of the other equipment used to install the cabinets or engine room) , battery cabinet, The battery compartment, used to install the battery rack or engine room) , power cabinets, Used for installation of power supply and power distribution unit cabinet or engine room) 。 According to the current China railcom, China mobile, China unicom and China telecom's bidding, outdoor cabinet single ark is generally divided into two kinds of specifications. Each high specification contains four basic functions tank; Power supply cabinets, power cabinets, equipment cabinets, battery cabinet. Power used to install the power supply and storage battery; Equipment cabinets used for communications equipment installation, wiring devices ( DDF、ODF) And other spare parts/accessories, cabinet put oneself in another's position depending on the equipment installed inside each other independent temperature control; Battery used to install storage battery; Power supply cabinet used to install the power and communications equipment; Outdoor cabinet power cabinet: power part is contained in the power supply warehouse and battery warehouse, installation of power equipment and batteries respectively; Power supply warehouse contains power supply device, battery to provide the battery tray and installation space; Full power equipment of the power capacity for a - 120 600 a, rectifier module on-demand configuration; Power supply warehouse support 19 inches ( IEC297) And 21 inches ( 电信) Standard rack ( 19 and 21 inch frame adjustable) And support to meet the requirements of installation space inside the cabinet size other all sorts of equipment installation; Power within the warehouse to meet according to user requirements configuration mobile oil machine interface ( Optional) Whether, when oil machine power, can control alone to recharge the battery. The high of 1. 8 meters of battery can support at least two groups of 150 ah colloidal battery ( The lithium iron batteries) Installation, the high of 1. 4 meters can support two groups 150 ah battery storehouse colloidal battery ( The lithium iron batteries) The installation. Communication base station outdoor cabinet power supply cabinet: power supply integrated ark contains power equipment, and provide communication equipment installation space; Power supply equipment of power supply capacity for 300 a and 500 a full two specifications, the rectifier module on-demand configuration; Power integrated ark support 19 inches ( IEC297) And meet the requirements of the cabinet size installation space in other kinds of equipment installation; Power integrated can according to user requirements contained in the configuration of mobile oil machine interface ( Optional) Whether, when oil machine power, can control alone to recharge the battery. After the power integrated ark opens the door to ensure smooth installation and maintenance; Outdoor cabinet equipment cabinet: cabinet support 19 inches ( IEC297) And 21 inches ( 电信) Standard rack ( 19 and 21 inch frame adjustable) , as well as the support to meet the requirements of installation space inside the cabinet size other all sorts of equipment installation; Equipment installation has contained in the ac dc power distribution unit and power environmental monitoring system ( Optional) ; Outdoor cabinet battery cabinet: when high cabinet put oneself in another's position within the specifications for 1800 mm, can be installed four groups of 150 ah battery ( The lithium iron batteries) ( Optional) ; When the cabinet put oneself in another's position within the specifications of the high is 1400 mm, 150 ah battery can be installed three groups ( The lithium iron batteries) ; Battery cabinet with hydrogen device; Battery set for battery contained in the seismic strengthening with tray, guardrail ( All sides and top) And steel columns, railing on the reinforcement should be installed at proper place reserved hole, steel stud should be on every 1 u distance reserved one installation hole reinforcement;
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...